The latest Weekly Road Work Report from the Texas Department of Transportation for January 31st through February 6th.
Bowie County
I-30 – From FM 989 to Arkansas State Line, widening highway. Reconstructing and widening highway. Eastbound traffic moved to the outside lanes.
SH 8 – At Sulphur River, replacing bridges.
SH 93 – Between US 82 and US 67, installing sidewalks.
SH 98 – At Anderson Creek, replacing bridge. All traffic restricted to one lane with signal lights controlling traffic through work zone.
Camp County
None
Cass County
SH 8 – At Sulphur River, replacing bridges.
Harrison County
US 59 – From one mile south of FM 1997 to FM 1793, installing safety barrier cable. Daily lane closures.
SH 43 – At Kansas City Southern Railroad in Karnack, widening bridge over railroad. All traffic restricted to one lane with signal lights controlling traffic through work zone.
FM 1186 – From US 59 to Panola County Line, installing safety end treatments on culverts.
Marion County
US 59 – At Big Cypress Creek, repairing portions of concrete bridge. Daily lane closures.
Morris County
SH 49 – From Titus County Line to FM 144, repairing and resurfacing highway.
Panola County
US 79 – From SH 149 to Rusk County Line, repairing and resurfacing highway.
US 59 (NE Loop) – From US 59 North to US 79 East, repairing and resurfacing highway. On and off ramps at US 59 and NE Loop closed, traffic detoured accordingly.
SH 315 – From West Loop in Carthage to Rusk County Line, installing safety end treatments on culverts.
Titus County
SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.
Upshur County
None