Here is the Texas Department of Transportation Weekly Road Work Report for October 11th through the 17th.
Bowie County
I-30 – From FM 989 to Arkansas State Line, widening highway. Construction work will begin on shoulders with most of the work being conducted at night.
SH 8 – At Sulphur River, replacing bridges.
SH 93 – Between US 82 and US 67, installing sidewalks.
SH 98 – At Anderson Creek, replacing bridge. All traffic restricted to one lane with signal lights controlling traffic through work zone.
Camp County
None
Cass County
SH 8 – At Sulphur River, replacing bridges.
Harrison County
US 59 – From FM 1997 to Marion County Line, repairing and resurfacing highway. Traffic restricted to one-lane each direction.
SH 43 – From Loop 390 to Haggerty Creek, repairing and resurfacing highway.
FM 1186 – From US 59 to Panola County Line, installing safety end treatments on culverts.
Marion County
US 59 – From 1.5 miles south of FM 2208 to Harrison County Line, repairing and resurfacing highway. Traffic restricted to one-lane each direction.
Morris County
SH 49 – From Titus County Line to FM 144, repairing and resurfacing highway.
Panola County
US 79 – From SH 149 to Rusk County Line, repairing and resurfacing highway.
US 59 (NE Loop) – From US 59 North to US 79 East, repairing and resurfacing highway.
Titus County
SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.
Upshur County
None